Trying out Preproduction Documents

Trying out Preproduction Documents

History

System Administrator opened work package 4: Implementation.

25.03.2019

System Administrator opened work package 3: Design and prototyping.

25.03.2019

System Administrator accepted work package 1 by review.

25.03.2019

System Administrator submitted WP1 for review.

25.03.2019

System Administrator joined as mentor.

25.03.2019